PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing duct work at the 1st Floor Facing East (800x600).jpg Installing sprinkler piping at the 1st floor Facing South-East (800x600).jpg Welded beam clips at the 4th floor at the East Elevation (800x600).jpg
Previous pageNext page Installing sprinkler piping at the 1st floor Facing South-East (800x600)
Installing sprinkler piping at the 1st floor Facing South-East (800x600)